|
| Cowart Creek Diversion Between FM 1128 and Wells Rd |
| Hickory Slough Detention at Max Rd. Please See Interactive Map |
| SH35 Drainage Along SH35 from FM518 to BW8 |
| Walnut St. and Veterans Drainage Improvements Please See Interactive Map |
| Dolores Fenwick Nature Center Phase 2 (Design) Off Magnolia Behind the John Hargrove Environmental Center |
| Firestation 6 - Savannah Lakes Savannah Parkway |
| Hillhouse Road Phase I North of FM 518 on Hillhouse Road |
| Max Road Sports Complex Phase I Please See Interactive Map |
| Trail Connectivity Phase I Along Mary's Creek from Centennial Park to FM-1128 |
| Adaptive Traffic Signal Between Kirby Drive and FM 1128 |
| Bailey Rd - Veterans to FM 1128 Bailey Rd between Veterans and FM-1128 |
| Business Center Drive Two lanes from Broadway to the southern entry of the Pearland town Center and four lanes from the southern Pearland Town Center entrance to CR59 |
| Highway 35 Reconstruction Beltway 8 South to Walnut Street |
| Orange Street Improvements SH35 to Hatfield |
| Project Gateway Center Median along Pearland Parkway just south of the Clear Creek Bridge |
| Barry Rose WWTP Lift Station and Influent Sewer Barry Rose and Pearland Parkway |
| Bellavita Waterline Bellavita subdivision to Dixie Farm Road |
| City of Houston Connection Please See Interactive Map |
| Far Northwest Wastewater Plant Decanter Replacement Shadow Creek Parkway Between Kirby Dr. and Kingsley Dr. |
| Hatfield Basin Trunk Sewer Line Hatfield Road from Magnolia Road to Broadway Street |
| Hooper Rd. Utilities Please See Interactive Map |
| Longwood WWTP Lift Station Replacement and Plant Rehabilitation Please See Interactive Map |
| Old Alvin Water Please See Interactive Map |
| SH35 Water and Sewer Along SH35 from FM518 to BW8 |
| Surface Water Plant Please See Interactive Map |
| Twin Creek Regional SCADA Lift Station and Basin Rehab Please See Interactive Map |