![]() |
South of Mary's Creek between Veterans Rd and Railroad
February 2009
The proposed Veterans Drive detention facility will be 101.6 ac-ft of offline detention. This proposed facility will help with some localized flooding issues upstream by reducing the flows for the 10 and 50 year storm events. Also, the detention facility will be used to mitigate for the Magnolia Road widening between SH 35 and McLean.