Longwood WWTP Lift Station Replacement and Plant Rehabilitation
Location:
Please See Interactive Map
Estimated Completion Date
July 2011
Project Details
Construct a new larger and deeper liftstation at Longwood Wastewater Treatment Plant sized to handle current and futureplant flows, replace the sand filters, complete centrifuge rehabilitation, and complete clarifier modifications.
Project Justification
The current plant liftstation is undersized and results in reduced effective capacity for the treatment plant. Existing pumps are adequate to handle flows from a larger liftstation, so there will be no increase in operating costs. The existing sand filters are over 20 years old and are in extremedis repair, with metal failures resulting in poor effluent turbidity and loss of sand. We plan to investigate alternative technologies to sand filters, including disc filters. The centrifuge and clarifier work relates to normal equipment life.