Hickory Slough Detention at Max Rd.

Location:

Please See Interactive Map

Estimated Completion Date

January 2012

Project Details

This project is intended to provide approx. 425ac-ft of detention along Hickory Slough. The project will include a wier, pumpstation, and will be designed to accommodate for a concurrent project use, a sports field complex on the basin floor. Phase I will consist of approximately 100-Ac Ft.

Project Justification

Extreme weather events currently inundate and flood residential neighborhoods in the vicinity of Hickory Slough. The project will allow for detention along the slough to lower the level of the slough during 3, 10 and 100 year events. Additionally, the athletic/sports use will be a concurrent use for this site.