Magnolia Rd from Veterans Drive to SH 35 and John Lizer from SH 35 to Pearland Parkway
July 2010
This transportation project includes the second phase of construction. This phase includes the widening of the existing two lanes of Magnolia Road from Veterans Drive to SH 35, and the widening of the existing two lanes of John Lizer Rd from SH 35 to Pearland Parkway. The project includes a four lane overpass over the BNSF Railroad,and a new 12 inch water line from Veterans Dr to Pearland Parkway, new drainage, and new traffic signals at Veterans Dr., and Pearland Parkway and signal upgrade at SH 35, sidewalks, landscaping and street lighting.